I am owned by Pauline and Mark Blasky. My hull was built at the Duncan Marine Yard in Taiwan and launched in Dec of 1980. It is a William Garden design based on the Pixie Design and called by Duncan Marine a Freedom 45. They are the fourth owners and have owned me the longest. They have done extensive refitting to me including replacing my entire deck structure and rig. My masts are roughly 10% taller than original and now are made of aluminium as opposed to the original wood ones, which, though pretty, were always problematic. You can read more about me under "MORE ABOUT SARI TIMUR"

April 8, 2021

A New Alternator

 After ripping out our old refrigeration compressor, we had space to move the alternator back to a more accessible place.  The configuration we had when we installed this engine did not allow for much space for both an alternator and a fridge compressor. The alternator had to be taken out to change a belt and the belts could only be slightly adjusted after that so belt changes were more often than normal, and always required a swear word or two.  Unfortunately the old alternator would not fit any normal bracket so we would have to have a special bracket manufactured locally.  After discussing this with the USA's Perkins genius, we decided to order the bracket and a new 120 amp alternator from him.  We have it and now it is installed and working fine.  

Here is a picture to prove it.



April 1, 2021

Mother Nature's April Fool's Joke

 Today is April Fool's Day.  And this is what we woke up to.




March 26, 2021

A New Fridge/Freezer

As many of you might know Sari Timur requires a fridge.  We do not drink warm beer!!! 

Many years ago our only fridge was a big box with a couple of holding plates and an engine driven air conditioner to freeze the plates.  When we set sail for Africa it started to act up.  And we limped with it for another couple of years.  Then Mark's parents came for a visit in Africa so we loaded up their luggage with a brand new SeaFrost system.  After returning to Singapore we added a shore power compressor as well. 

Many years later we cut the box in half and added a door type fridge and reused the other equipment to work in the smaller box.  Well after 28 years the African fridge started misbehaving again.  Since the newer DC powered air cooled fridges made for boats have improved so much we decided to go that route.  That meant we could get rid of the shore power system, and the engine driven system, heat exchangers and water pumps.  

We decided on a CoolBlue unit as we had heard good things about them.  So we ordered one and are happy to say it installed nicely.  At the warmest setting we have, it keeps the box below 22 degrees and it only runs every so often.  Probably too cold for beer but we can dial it down to be an actual freezer. We then can convert our Dometic Portable freezer into a fridge for drinks.  Sounds like a plan.  Here are some pics.

The Compressor,Condensor, and Dryer/Filter

Close Up

The New Holding Plate




March 9, 2021

It's Been A While

Wow we just realised that we have not done a post since Mark left for Dutch Harbor.  He returned at the end of January.  We have been doing fine.  The winter winds have been exceptional in Sitka this year but the shrink wrap is holding up ok.

We both have had our Covid vaccinations so we are good to go in that department.

Mark has been hard at work trying to fix the starboard side of the coach roof, like he did the port before we left Seward.  He is nearly done, a few more days should see it through.  For those who do not remember we developed a leak on the port side where the deck joins the coach roof. We also had a small leak on the starboard side but it was very small.  

The project entails cutting the glass away on the coach roof from the deck to a couple of inches up.  He has to work in 8 inch sections as that is how much the external heater can heat to make the repair epoxies kick off.  He has to dig out all the rotten wood and dig down to below deck level, then fill all that back up with epoxy, glass, and filler.  On the port side there was a fair amount of rot so the job was bigger but the digging was easier.  On the starboard side the wood is pretty much intact so he has to use the grinder, chisels and drills to get the wood out to below deck level.

To save a 1000 words here are a couple of pictures.


This is a hole dug out

that is all the part finished plus around the corner to the mainmast


December 30, 2020

Mark is on his way to Dutch Harbor

 Mark got the call and had to leave a few hours later to head for Dutch Harbor.  The Reece Eagle picked up a couple of quick jobs and he had to fly out in a hurry to beat the bad weather hitting Dutch on New Year’s Day.  

December 15, 2020

Our New Heater

 As we said in an earlier post we gave up on our wood burning heater and ordered a new diesel burning heater.  That was in July.  It finally arrived on the 24th of November and Mark did most of the installation while he was recovering from Covid.  He had to wait until he got the all clear sign from the health department before he could finish the installation as he needed some additional parts.   So Sunday was the day that the heater was finally installed.  We test fired it and all looked good for a short while until a large whoosh sound happened and the heater went into superheat.  Luckily, one of the parts Mark was missing was an external valve and we quickly turned off the fuel supply and watched and waited nervously for the fuel to burn out.  Both the chimney and burner turned red hot.  We swear we could see through the metal!  Eventually it stopped and cooled down.  We talked with the technical department and found out what went wrong.  So today we again tried out the heater and are happy to say it has been running all day with no issues.   We have to run it a little lower than we thought to keep the surrounding area from getting too hot but heats the main salon up to 68 degrees on the lowest setting.




December 10, 2020

Mark Brought the COVID Home

 Well Mark got home on the 29th of November.  As he was passing through Anchorage he took a COVID test so he wouldn't need to quarantine too long.  But little did he know he had been exposed to COVID 19 in Kodiak.  The good news is the results came back quick enough and we were able to back trace and we exposed no one.  Everyone at Pauline's work tested negative and so did the two people Mark met in Seward.  Unfortunately his entire crew tested positive.  Pauline came down with symptoms five days after Mark arrived home and also tested positive.  We are on the mend and just waiting our time out to finish the quarantine period.  We have been told by the health officials that after the symptoms finish 10 days later we will not be contagious.  Mark has passed that stage but as Pauline is still finishing out her symptoms he is not seeing anyone yet.

October 27, 2020

Mark is on his way to Nome

 Mark received a text from one of his old colleagues that said they needed a mate to take the Fish hawk from Nome back to Seward.  Because it is late in the year.  Urgency was required.  So Monday was a mad rush to put together a travel bag as his work gear is all in Dutch Harbor.  Don’t know if he will get a chance to see the town or not. 

October 21, 2020

Our New Home

 We got a permanent Berth!  After 13 months on the wait list, we finally have been assigned a new berth.  This means if we leave to go for a day sail or longer, we will still have our berth when we come back. There will also be no issues with the electric company because some one else jumped in our spot.  The view is not as nice but the new neighbors all seem very nice and it is much more protected than where we were before.

Sari Timur Secured In Her New Slip


September 21, 2020

What's Happening During CV-19 Isolation

 Well, as many of you know, Pauline's job is classified as essential, so she has been working and thus bringing in a paycheck.  Mark however has not worked for money since the first week of June.  He has taken the time off to do some much needed repairs on Sari Timur.  The biggest ones are the leak in the aft cabin and refurbishing the wheel.

We have been chasing a leak in the aft cabin since shortly after crossing the North Pacific.  Because of where the drip was happening we suspected that it was coming down through or around one of the fittings for the dinghy davits/mizzen traveler.  However, numerous attempts at rebedding and caulking around these fittings did nothing.  After a couple of years, we finally had dry rot in the  ceiling panel above the aft cabin window.  Mark decided to attack this with pry bars, chisels, hammers, sawzall etc until he finally had the whole underside exposed.  Luckily this year has been one of the rainiest on record and once exposed from underneath, Mark began tracking the trails.  The culprit prove to be some rot in some of the joints near deck level in the aft deck boxes.  So in between rainstorms, Mark began to dig and repair the spots.  There were four areas in total plus some rot had opened up a seam where the teak deck meets the box.  After a few weeks, the last of the leaks was discovered and the seams recaulked.  The leaks were finally stopped!  Note these boxes are glassed on the inside to make them waterproof but that means the water, if it enters the way it did, it wicks a long way before it can find an exit.  

So now he had to fix all the rotted spots in the aft cabin. This meant repairing or replacing some of the boxes support beams and reinforcing the floor of the box.  The beams were not hard, some wood and epoxy and a lot of cursing and it was soon done.  The bottom of the boxes were plywood and most of this had been scraped out so rather than replace with new plywood, Mark decided to glass from underneath which is kind of like glassing upside down.  We felt that this would not only be a better way to make the fit more water tight, it would also strengthen the whole support structure better.  If you have ever glassed upside down in a tight space you know the drama that this required.  If you haven't, consider yourself lucky!  We then also decided to put foam insulation panels in between the beams to help with insulation.  

The next step was to refit the panel.  He made a template and then traced this out onto a piece of half inch marine ply.  Pauline took a day off of work to help him do this and fit the panel.  It took about four attempts with a little shaving off here and there before it slipped into place but finally it was up and in.  It still requires a bit off faring to match the panels next to it but we are happy with the results.  It is the end of the fishing season so our normally well stocked chandlery is short on a lot of things including faring material but some is scheduled to arrive on Wednesday.

On both sides of the panel the surfaces were also damaged this is mostly what requires the faring before painting

The Panel Finally Fits and Is In!

What the boxes look like from outside



The other big project was refurbishing the wheel.  We have mentioned our wheel in a post long ago, but for those that don't remember it is nearly 75 years old and used to steer the British East India Steamship, Kampala.  The original owner of Sari Timur (called Freedom II) in those days took the Kampala to the scrap yard in the Middle East back when he was fitting out Sari Timur.  He felt the wheel was too pretty to be destroyed so he carried it back to Taiwan and fitted it to the sailboat.  It has been a showpiece in the cockpit ever since. But it was looking a bit decrepit so again Mark got after it.  There are still some remaining coats required but it looks much better now.  And we are hoping for breaks in the rain to finish it off before winter.

Our Wheel